CPM SCHEDULING

From the implementation of scheduling systems for large municipal CIP’s to highly detailed baseline schedule development and schedule management services for General Contractors, CPG has the resources required to put your project on a path to success.  Through streamlined systems, CPG can deliver sophisticated and thorough project schedules that capture planning, forecasting, and implementation of work to assist in the proactive mitigation of project delay and cost overruns.

GP at 290

Our Work in CPM Scheduling

P1-101 Sludge Dewatering And Odor Control Facility

Owens Lake Dust Mitigation Project Phase 9/10

San Jose Creek Flow Equalization Facilities

North Santa Monica Boulevard Roadway Reconstruction

1-66 Corridor Toll Road Expansion Design Build

California High Speed Rail, Construction Package 4 Design Build

Duke Energy Grid Improvement

Lawa Utilities & Lamp Enabling Projects (Lulep)

Oc405 Design Build

Isabella Lake Dam Safety Modification Project

Sierra Army Depot Building 306 Rehab

Nasa Ames Research Center Estimating Support

March Air Reserve Base Satellite Fire Station

Global Vigilance Hangar, Building 1414, Edwards Afb

Repair Barracks 251, Fort Irwin

Navfac North Island Nas Coronado Replace And Repair Doors And Hardware Throughout

Nro/Usace Vandenberg Air Force Base Building B2500 Renovation

Edwards Afb Building 1030 Repair And Remodeling Of Bathrooms

Navfac North Island Nas Coronado Buildings 787 And 1507 Boilers And Heat Exchanger Replacement

Edwards Air Force Base Energy Conservation Improvement Program For Repair/Retrofit Lighting, Phase 3

Lower Santa Ana Reach Phase 4 Channel Rehabilitation

Seal Beach-Missile Magazine Storage Facility

Naval Air Weapons Station China Lake Missile Magazine & Inert Storage Facility

Vvwra Sub Regional Water Reclamation Plants

Wastewater Treatment Facility Upgrade

Solids Thickening And Process Upgrades

Wastewater Authority 14.0 Mgd Plant Expansion

Plant Water Rehabilitation Project

District 6 Tank Sewer Rehabilitation

Sanitary Sewer Beach Interceptor

Concrete And Protective Linings Repair

Capital Improvement Schedule And Management

North Atwater Multimodal Bridge

Fullerton Road Grade Separation

Clinton Keith Road Construction Phase 2

Forth Replacement Crossing

Reconfigure/Reconstruction Of Dana Point Harbor Entry And Improvements

Reconfigure/Reconstruction Of Brookhurst Street

Replacement Of The Mount Vernon Bridge

Qantas Hangar Demolition

West Aircraft Maintenance Area

Runway 25l Improvements

Taxiway P Improvements

Fedex Distribution Center

Replacement Reactor Vessel Head & Simplified Assembly Project

Decommissioning Independent Spent Fuel Storage Installation (Isfsi) Project

Iter Central Solenoid Magnet Fabrication

Hwy 210 Electrical And Communication Upgrades, Project 07-0n7904

Coto De Caza Lift Station

Backup Generator Upgrades

Badger Avenue Bridge Rehabilitation (Motor And System Upgrades)

Capital Improvement Program Analysis And Review

University Of Utah Ambulatory Care Complex

Orthopedic Institute For Children

Kaiser San Leandro Foundry Site Work, Site Remediation And Improvements

Wilson Meany, Hollywood Park Casino Redevelopment, Site Demolition And Improvements

Atep Civil And Site Improvements

Berths 171 To 173 Environmental Remediation

Olinda Landfill Phase 1 Partial Final Closure & Utility Improvements Project

Olinda Landfill Phase 2 Partial Final Closure Project

Frank R. Bowerman Landfill East Flank Landslide Remediation Project

Ph 8b-2 Soil Buttress And Composite Liner Project

8c & South Basin/Wetlands Expansion Projects

Water Pipeline And Facilities Installation

Project M Terminal Site Improvements

Berths 142-143 Expansion

Berths 144-145 Expansion

Hollywood Park Racetrack Demolition

San Pedro Waterfront Promenade

Sna John Wayne Electrical Improvements

10754.10 Caltrans Laguna Beach

Trampas Canyon Dam Revitalization And Reservoir Project