CPM SCHEDULING
From the implementation of scheduling systems for large municipal CIP’s to highly detailed baseline schedule development and schedule management services for General Contractors, CPG has the resources required to put your project on a path to success. Through streamlined systems, CPG can deliver sophisticated and thorough project schedules that capture planning, forecasting, and implementation of work to assist in the proactive mitigation of project delay and cost overruns.


CPM Scheduling Lead
CPM Scheduling Team
Our Work in CPM Scheduling
P1-101 Sludge Dewatering And Odor Control Facility
Owens Lake Dust Mitigation Project Phase 9/10
San Jose Creek Flow Equalization Facilities
North Santa Monica Boulevard Roadway Reconstruction
1-66 Corridor Toll Road Expansion Design Build
California High Speed Rail, Construction Package 4 Design Build
LAWA Utilities & Lamp Enabling Projects (LULEP)
Isabella Lake Dam Safety Modification Project
Sierra Army Depot Building 306 Rehab
NASA Ames Research Center Estimating Support
March Air Reserve Base Satellite Fire Station
Global Vigilance Hangar, Building 1414, Edwards Afb
Repair Barracks 251, Fort Irwin
NAVFAC North Island NAS Coronado Replace And Repair Doors And Hardware Throughout
Edwards AFB Building 1030 Repair And Remodeling Of Bathrooms
NAVFAC North Island NAS Coronado Buildings 787 And 1507 Boilers And Heat Exchanger Replacement
Edwards Air Force Base Energy Conservation Improvement Program For Repair/Retrofit Lighting, Phase 3
Lower Santa Ana Reach Phase 4 Channel Rehabilitation
Seal Beach-Missile Magazine Storage Facility
Naval Air Weapons Station China Lake Missile Magazine & Inert Storage Facility
VVWRA Sub Regional Water Reclamation Plants
Solids Thickening And Process Upgrades
Wastewater Authority 14.0 MGD Plant Expansion
Plant Water Rehabilitation Project
District 6 Tank Sewer Rehabilitation
Sanitary Sewer Beach Interceptor
Concrete And Protective Linings Repair
North Atwater Multimodal Bridge
Fullerton Road Grade Separation
Clinton Keith Road Construction Phase 2
Reconfigure/Reconstruction Of Dana Point Harbor Entry And Improvements
Reconfigure/Reconstruction Of Brookhurst Street
Replacement Of The Mount Vernon Bridge
Qantas Hangar Demolition
West Aircraft Maintenance Area
Runway 25l Improvements
Taxiway P Improvements
Fedex Distribution Center
Replacement Reactor Vessel Head & Simplified Assembly Project
Decommissioning Independent Spent Fuel Storage Installation (Isfsi) Project
Iter Central Solenoid Magnet Fabrication
Hwy 210 Electrical And Communication Upgrades, Project 07-0n7904
Coto De Caza Lift Station
Backup Generator Upgrades
Badger Avenue Bridge Rehabilitation (Motor And System Upgrades)
Capital Improvement Program Analysis And Review
University Of Utah Ambulatory Care Complex
Orthopedic Institute For Children
Kaiser San Leandro Foundry Site Work, Site Remediation And Improvements
Wilson Meany, Hollywood Park Casino Redevelopment, Site Demolition And Improvements
Atep Civil And Site Improvements
Berths 171 To 173 Environmental Remediation
Olinda Landfill Phase 1 Partial Final Closure & Utility Improvements Project
Olinda Landfill Phase 2 Partial Final Closure Project
Frank R. Bowerman Landfill East Flank Landslide Remediation Project
Ph 8b-2 Soil Buttress And Composite Liner Project
8c & South Basin/Wetlands Expansion Projects
Water Pipeline And Facilities Installation
Project M Terminal Site Improvements
Hollywood Park Racetrack Demolition
San Pedro Waterfront Promenade
SNA John Wayne Electrical Improvements
10754.10 Caltrans Laguna Beach
Trampas Canyon Dam Revitalization And Reservoir Project