North Santa Monica Boulevard Roadway Reconstruction

project at a glance

Location: Los Angeles, CA

Project Dates: 2017 - 2018

Owner: City of Beverly Hills

Client: City of Beverly Hills

Sector: Transportation/Infrastructure

Services: Scheduling

Description

Rebuild the roadway with a rubberized asphalt surface to provide a smoother, quieter and safer ride. Upgrade the drainage system, relieving ponding and damage caused by standing water at various locations. Upgrade and create new curbs and gutters. Widen the south side between Canon Drive and Wilshire Boulevard. Install a uniform, improved street-lighting system along the north side, which provides lighting for both sides of the street. Install ADA compliant access upgrades. Upgrade existing sidewalks and driveways. Construct drainage landscaping (grass swales) which captures surface water run-off from both the street and the adjacent park areas, that complies with urban water quality regulations. Upgrade the Landscaping on the south side of the boulevard.